Migrate Siemens STEP 5 programs

Start with the listing an S5 engineer can still produce. Altitude reconstructs the sequence from the blocks and symbols and documents how its I/O and timers map to a modern controller.

Siemens
Vendor
Siemens
Files
Text listingPDF program listingSymbol list
Covers
SIMATIC S5
  1. 1 Add a readable STEP 5 listing with available symbols and I/O drawings
  2. 2 Check the transcribed source and review the conversion decisions
  3. 3 Compile and test the result on the target platform

Everything a STEP 5 file holds, in one conversation

Work from the available listing and keep each conversion decision with the target program.

  • Trace signals and block calls through a STEP 5 listing
  • Carry S5 timer behavior into the target and identify timing assumptions
  • Produce a conversion report for the engineer commissioning the replacement
  • Check against industrial standards such as IEC 61131-3, ISA-88, ISA-95 and PackML, or your own

Requests engineers type every day

  • Explain this S5 sequence from its listing.
  • Map these S5 timers for a move to TIA Portal.

The work STEP 5 projects need most

See Altitude on your STEP 5 files

We'll walk through the requests that matter to your team on the platforms you run, from review and troubleshooting to documents and migration.